Sunday, 30 November 2014
Foundations, plinth and slab done
Ready to go up!
The conduits for the electric wiring and gas are installed.
Slab down.
Greyton was in the upper 30s today and sweltering.
Kath and I visited, dropped off gates and fireplace, and had lekker lunch.
Foundations Done!
The foundations have been dug beautifully and bricks brought on site for the plinth and pillars between the sandbags :)
We spent a fun week-end at the Hippo and visited the plot.